新冠疫情下国际工程承包商索赔管理及行业发展展望
摘要:JournalofOilandGasTechnology石油天然气学报,2020,42(2),162-165PublishedOnlineJune2020inHans.http://www.hanspub.org/journal/jogthttps://doi.org/10.12677/jogt.2020.422029UnderCOVID-19OutbreakingSituationInternationalContractorClaimsManagementandIndustryDevelopmentProspectMengYaoChinaPetroleumPipelineBureauEngineeringCo.Ltd.International,LangfangHebeiReceived:Mar.27th,2020;accepted:Apr.30th,2020;published:Jun.15th,2020AbstractHugeconstructionprojectswerecontractedbyChineseContractor,thelarge-scaleoutbreakCOVID-19worldwidewithinshorttimecausedseriousinfluencetooverseasprojectcontractingenterprises,mainlyinstaffstuck,thegoodsshippedoutofcontrol,construction,projectcostbreakdown,etc.,greatlyin